Walls

The core concept of Redplug’s Red-Stop™ system is cavity wall remediation. We do this by taking over the heavy lifting of missing, misplaced, and displaced fire barriers at compartment lines and around openings at doors and windows etc. Red-Stop™ is a mass fill system utilising fully compliant and class-A1 stone mineral wool fibres.

External Walls

Post-Grenfell it has become clear that there is a generic problem with ill fitting, misplaced, or even missing cavity wall fire barriers at compartment lines and around openings. This is where Redplug’s Red-Stop™ system comes in. A quick, cost-effective mass fill remedial fire barrier backed up by fully assured fireproof testing in accordance with BS:EN: 1366-4 – 2021.

Loadbearing & Non-loadbearing internal Walls

This is a growing issue and Red-Stop™ has the answers. 
Red-Stop™ has been installed in several hotels and multi-occupancy buildings to mitigate fire spread via loadbearing & nonloadbearing partition walls and corridors. Another quick, 
cost-effective remedial fire barrier backed up by fully assured fireproof testing in accordance with both BS EN 1364-1:2015 & 
BS EN 1365-1:2012.

Partition Wall Voids

Redplug has a growing portfolio of projects where our stone mineral wool has been used to mass fill voids between existing and new buidings up to 1200mm in width and 20m high. Red-Stop™ has been used on PBSA projects, between buildings and new external lift shafts, and in conventional multi-occupancy domestic buildings. 

Red-Stopâ„¢ Adding Value